In Köprüyanı HEPP Hydro Power Plants which constructed by ANDRITZ HYDRO TURKEY, the testing and commissioning of the MV Panels have completed and prepared for acceptance of Ministry of Energy and Natural Resources
Andritz Hydro Turkey Köprüyani Hepp Hydro Power Plants The Testing And Commissioning Of The Mv Panels Have Completed
Articles récents
- Rencontrons-nous à ETUK 2023 Izmir 14 février 2023
- CONSTRUCT IRAQ – Iraq’s Largest Construction Industry Fair 14-16 November 2023 14 février 2023
- We participated in the WIN EURASIA fair organized by Deutsche Messe in Istanbul 5 août 2022
- We participated in the 2022 Football Tournament organized by TEİAŞ 4th Regional Directorate Youth and Sports Club and received our Plaque 3 août 2022
- As AR Elektrik we Participated in Iraq’s Largest Construction Industry Fair Held in Erbil 1 août 2022
Catégories
- Événements (12)
- Nouvelles de nous (38)
- Présentations de Produits (1)